Training Platform

The training platform is open to all interested parties within Germany, with a focus on companies, research institutions, and public organizations. Projects are initially granted for a maximum of 12 months, with the possibility of extension if required. Direct access is provided via a shell and a batch system; the system is not intended for interactive applications. Access is managed through the ProjectPortal, where users can also add other collaborators as project members. The training system is located in Göttingen and consists of 35 nodes, each equipped with 4 NVIDIA A100 SXM4 GPUs (80 GB HBM2e memory), as well as 11 nodes, each equipped with 4 NVIDIA H100 SXM5 GPUs (94 GB HBM2e memory). Within each node, the GPUs are connected via NVLink, while the nodes themselves are interconnected using an InfiniBand HDR fabric (2x 200 Gbit/s per node). Software, models, and data can be installed via self-service or integrated using the KISSKI catalogs. The system can be used either through direct access or as a technical foundation for KISSKI services.

Book Now (opens in new window)

Conditions of Use

Using the training platform requires an up-to-date SSH client, along with a local X server or Wayland system, depending on the specific application.
The training platform comes with a base limit of 3,750,000 CPU hours, which is equivalent to 25,000 GPU hours. This limit can be increased upon request. Additionally, 2 TB of storage is provided; this limit can also be increased upon request. Specific requirements apply to the indirect use of computing resources via the services offered by KISSKI.

Success Stories

https://gwdg.de/hpc/systems (opens in new window)

Do you still have any questions? You can consult our FAQ section or reach out to our support team.

Documentation (opens in new window) FAQ Support